1. Wall 8: section d (December 2007)

Notes (July 2009)

Stable but needing major work

Medieval rubble masonry with remains of wall walk. Loose stones to wallwalk

Reference Number
Recommended work
Priority

 

Wall 8.d

 

Clean walltop,wallwalk and vertical surfacesof all vegetation and loose material. Wash down to expose original materials and rebed any loose stonework.

B